Projects

GOSPEL OUTREACH SUBDIVISION & PLANNED UNIT DEVELOPMENT (Eureka, CA)

Provided engineering, topographic survey and construction staking for this Planned Unit Development, which included a church with associated parking, residential lots, and open space area. Coordinated site layout; prepared road, parking lot and utility plans, grading and drainage plans; developed, prepared and implemented Storm Water Pollution Prevention Plan; and conducted storm water observation and monitoring during construction.

STRONGS CREEK PLAZA (Fortuna, CA)

Provided engineering, topographic survey, and construction staking & management services for a 5.6 acre, 4-parcel commercial development (shopping complex) located near environmentally sensitive habitat. Prepared grading & drainage plan, Storm Water Pollution Prevention Plan, utility plans, and provided construction staking services for all site improvements. Performed ADA Compliance Survey following completion of construction.

SKANSKA, USA

St. Joseph's Hospital Expansion - Performed construction staking for layout of the new building addition and soldier pile installation for construction of the new basement, and monitored the existing buildings and newly installed soldier piles for movement. Prepared daily and/or weekly monitoring reports throughout construction.

ABB, INC.

Provided project management services to ABB in conjunction with their contracted soils exploration work at two PG&E substation sites.

CLEAR CREEK SYSTEMS, INC.

Prepared the grading and drainage plan and provided construction staking services for the recent addition of a water treatment system at PG&E’s Humboldt Bay Power Plant.

RESIDENTIAL DEVELOPMENT PROJECTS, INCLUDING:

Pavlich Subdivision (Humboldt Hill Area) – Project planning and permitting, topographic surveying, engineering, construction plan & Storm Water Pollution Prevention Plan preparation, construction staking and final mapping for a 15-lot subdivision on  Humboldt Hill.
 
Finkle Subdivision & Lot Line Adjustment (Cutten Area) – Project planning and permitting, topographic surveying, engineering, construction plan preparation, construction staking, and legal description and map preparation for this 5-parcel subdivision project, which included a lot line adjustment.
 
Los Harbors Subdivision (Arcata) – Topographic surveying, engineering, construction plan preparation, construction staking and final mapping for this phased development project located in the City of Arcata. 

CITY OF EUREKA

Fairway Drive Culvert Replacement Project - Provided planning, topographic surveying, engineering, construction staking and construction inspection services for the temporary detour road, new culvert, and ultimate road layout & alignment for the culvert replacement/stream restoration project located near the Eureka Municipal Golf Course.

Waterfront Drive, Phases II and III - Provided the phased design of some 4,400 feet of Waterfront Drive, consisting of construction plans, specifications, and engineer's estimate for roadway improvements, water, sanitary sewer and storm drainage facilities, and utility construction and relocation. Engineering, construction staking and construction inspection services were also provided.

CITY OF ARCATA

Bayside Road Sewage Lift Station - Design of a sewage lift station and topographic drainage system site plan, which included the preparation of construction plans for an access road, drainage, and the sewer lift station, construction staking and design engineer's supervision during construction.

Aldergrove Road Improvements- The project required soils exploration and analysis, and the preparation of plans, specifications and engineer's estimate for street improvements (including storm drainage structures) for the Aldergrove industrial area. Permits were initiated and obtained for funding for the railroad crossing and signalization through the Northwestern Pacific Railroad Company and the California Public Utilities Commission. Construction staking and limited inspections were performed during construction.

HOOPA  VALLEY

Hoopa Valley Public Utilities – Contracted to perform various surveying projects over the years in the Hoopa Valley area.

HUD Sites, Hoopa Valley, Hoopa, CA - Provided site design, surveying services, and sewage disposal system engineering for 40 HUD sites.

GEOTRACKER WELL SURVEYS FOR:

AMEC-Geomatrix Consultants
Sierra Pacific Industries
Clearwater Group

ALTA SURVEYS FOR:

Coastal Care Convalescent Hospitals
General Hospital
Mad River Hospital
Montgomery Wards
Red Lion Hotels
Redwood Care Centers
Victoria Village Development
U.S. Postal Service